Brenig Construction commenced works on the presitigous Penmaenmawr Road project in September 2015. The development includes the construction of 17 1&2 bed apartments and 11 2&3 bed houses.

Brenig Construction were instrumental in the designing the scheme and worked tirelessly with the Architects and Civil Designers to overcome significant issues which included the challenging topography, flooding issues, issues associated with the site being located within a conservation area and substantial environmental associated problems.

As part of the contract Brenig Construction have been appointed to carry out all infrastructure, substructure, superstructure and finishing works.

The management of interfaces between all parties on the project is crucial to the successful completion of the works. All works are to be completed during the programme period week 1 to 76 and thus coordination with other sub-contractors such as electricians, plumbers, joiners and electrical and plasterers is critical to ensure the daily activities are carried out safely and in the most efficient and economical way.

As part of the scheme we have been heavily involved in assisting the local community, holding such events as Meet the Buyer, Visits for the local Cubs group, Presentations to the local college, Site visits from the local college.

To date the scheme has enabled us to engage 3 apprentices on the scheme and we have also taken on an young person to work on the scheme through the construction youth trust.